General Sewing Data:
GSD – General Sewing Data – is that the ultimate in standard data.
GSD is so effective, the system is that the accepted international standard for methods – time measurement for the needle industry.
In the sewn-products industry, some 80% of the value is committed at the planning sampling stage. GSD gives your facility a costing tool that permits you to accurately predict the simplest known methods of producing before production. The system provides for the management of all operation standards and therefore the basis of rapid labor cost estimating.
What Symbols Used in Method of Time Study?
GSD creates a “discipline” for your facility – a standard standard language for engineering, pre-costing, and productivity applicable to each phase of your operation.
The GSD practitioner training includes comprehensive exposure to the GSD codes, times and application rules – and theoretical and practical visualisation exercises reinforce the necessity for accurate and consistent Work Measurement, continuous improvement and adherence to the economic engineering guidelines laid down by the International Labour Organisation, Geneva.
Simplicity and Accuracy with GSD:
GSD may be a computerized standard information system developed specifically for the sewn-products industry. The statistically validated elemental codes, constructed from a singular MTM™ (Methods Time Measurement) CORE DATA, represents an easy , universal language which is straightforward to find out and communicate.
The same simple codes are often fine-tuned to satisfy with any level of engineered methods, thus ensuring fast, consistent application with MTM-level accuracy. this is often true whether the system is employed in high-fashion or large volume/repetitive manufacturing environments.
Used as a predictive management tool, GSD provides the “Just in Time” (JIT) technology so critical in today’s highly charged manufacturing environment. just in case after case, GSD has helped facilities realize payback/return on investment (ROI) as soon because the system is installed. In fact, GSD’s cost – savings are measured up to 26 percent. (Realization of a six-month payback requires only a three-percent saving in direct labor payroll.) An intangible benefit is that the “awareness” that management, supervisors and operators gain thanks to changes in design, material, volume, technique and quality, all of which may be quantified within the GSD specification.
Benefits of GSD:
Substantial time reduction for style costing and elegance introduction.
Rapid quantification of changes in design, materials, volume, technique and quality.
Improvement in overall consistency rates.
Reduction of off-standard/average payments.
Evaluation and justification of latest equipment methods.
Setting and pre-engineering of consistent and accurate rates.
Elimination of lost business caused by overpricing of jobs.
Elimination of lost income caused by underpricing of jobs.
Overall management of producing standards data base.
Data transfer capabilities to other systems.
Efficiency of operator training via method specification.
Reduction of clerical time.