top of page

How To Prepare Production Planning in Garments industry?

Updated: Jan 11, 2021

Production planning is the very vital branch in clothes industry. Production planning is the controlling thing of clothes industry. It is includes the whole thing & each mission in the procedure to execution the shipping of items inside time frame. So, manufacturing planning is the controlling of manufacturing & manufacturing method decided by way of time frame. Planning branch format each and every fashion to execution the order inside time limit. Without time body garment can't maintain so garment enterprise need to comply with each mission by means of scheduling. Each order has a shipping date & manufacturing design branch observe manufacturing sketch on the base of shipping date. They understand when cloth & trims in-house in manufacturing unit will. Basically some of cloth & trims come from Local & internationally .So, they layout each alternative on the base of shipping date. A customer can judgment with the aid of cargo share & the place the supplier cutting-edge position? So manufacturing planning branch have to comply with some of the vital duties in the following.

  1. Capacity planning.

  2. Time & Action (TNA)

  3. Scheduling.

  4. PP meeting.

  5. Order Allocation.

  6. Man power & M/C allocation.

  7. Execution Of every tasks.

  8. Materials planning & In-house follow up.

  9. Delivery Meet.



Capacity planning: Production planning branch make manufacturing capability of a manufacturing facility due to the fact capability decided want order or not. If order capability is full entire the yr then do now not take over potential order due to the fact it is wished over value to make greater ability order. On the different hand, if potential order is no longer full then take greater order to fill the capability in any other case manufacturing facility will be loser by using financing. Production planning branch need to be inform forecast capability order to merchandisers & administration so they can inform to client for order.

Time & Action: Planning branch ought to observe each fashion as per schedule. Every order has personal time body & meet transport time. Every fashion observe product improvement to shipment. It is job venture for planning branch in any other case they can't meet shipping as per diagram schedule. So, Planning branch take motion very fashion comply with up inside time & Action calendar.



Scheduling: Production planning branch take choice when a fashion enter into line. On the agenda they cheek cloth & trims with save branch & Merchandising department. If get on time in-house each gadgets they can enter into line. on the different hand if now not get cloth & trims on time they can alternate line design to decrease the cost.



PP Meeting: Production planning branch cheek specific fashion cloth & trims repute with save & merchandising department. If each gadgets & approval is performed then they co-operation with all associated branch like as Merchandising, Production, store, cutting, Finishing, nice & consumer consultant to make clear grasp for specific fashion for production. Before PP assembly they can cheek all approval, manufacturing file, trim card & geared up dimension set.

Order allocation: Planning branch does line allocation for each and every style. When bought any order from customer they ought to allocation line plan. Without line format an order can't easily run for production. So order allocation is very necessary for planning department.


Man electricity & M/C allocation: Production planning branch take choice how many operators want for specific fashion to output. They can take choice line design for a unique style. And additionally take choice how many computer need to function the line. Then they can take nice selection for productiveness for specific style.



Execution of tasks: Planning branch need to be execution each assignment for advantageous planning. Without tremendous execution it can't easily production. So they have to execution each and every fashion planning order placement to shipment.



Materials planning & In-house: Planning branch should comply with up the material & trims comply with up with save & merchandising branch so they can pre-plan to nice line planning date.



Delivery Date: Production planning branch ought to observe transport date of a garments. If now not keep the clothes shipping on time it will be loser planning & fall down of a company. So, each and every fashion keep meet the clothes delivery. So, they can take positive selection for clothes delivery.




266 views0 comments

Copyright technologygmt.com. All Rights Reserved.

Contact us 
mashupall5@gmail.com

bottom of page